h1

A taste of success

February 11, 2010

Ted writes (via Iridium modem):

On Saturday, a long-awaited spell of clear weather threw the LARISSA Glaciology Team into fast action. Three of the five stations we hope to put in this are now up and running. Our highest-priority site, Flask Glacier, which flows into the last remaining part of the Larsen B Ice Shelf, is now fully instrumented.

Clear weather over Flask Glacier allowed the team to fly to several sites to set up AMIGOS stations.

The weather was spectacular for nearly three days, beginning on Saturday. With our first flight, our pilots, Richie Cameron and Dave, brought out the GPS system, a continuously operating precision GPS designed to record any subtle changes in the ice flow, even ones at a tiny scale, occurring on a daily or monthly basis. The GPS will also provide a detailed record of any general acceleration if the ice shelf thins and breaks apart.

Every time the plane engines rev, and the plane starts to move, a song just jumps out of my head, like a second heartbeat; Satisfaction by the Rolling Stones for the first flight; Ode to Joy later that day; Ring of Fire by Mr. Johnny Cash on the way back from the ice core camp.

Setting up the Flask GPS took us about 4 hours, and in a second flight, we moved down-glacier to the Flask AMIGOS site. AMIGOS is a heavily instrumented science station, sort of a super weather station with measurements of the ice added in. Terry and Ronald began to assemble the station even before the tents were set up, and had the basic framework laid out by evening. All five of us then set the lower Flask camp, still basically a mountaineering setup with backpack tents and few luxuries. But with five of us now in the cook tent, there was a camaraderie that made up for some of the tough conditions. For dinners lately, we’ve had chili, pan-grilled steak, tofu thai curry, and tonight, with luck and a bit of imagination, jambalaya.

A day trip on Sunday back to the Ice Core Camp got the AMIGOS station there stood up and operational (we had it running, but not erected, for about a week), and on Monday we finished the Lower Flask AMIGOS, the most sophisticated yet. It contains a full-precision GPS (from the GRS-1 board built by TopCon Inc.), a steerable camera system, a full weather station, a sun and reflectivity sensor, and a thermistor string extending 12 meters into the snow. We worked 13 hours that day, until darkness came.. Darkness and night have begun to return here.

As we worked on Monday evening, the fog and snow returned. Tuesday we managed to survey several short radar lines, but fog and poor lighting conditions made it risky to explore too far; the camp is surrounded by huge crevasses. Wednesday we returned to our waiting-for-sunshine mode, that is, looking over the data, sorting the food, reading books, walking short distances for exercise, quoting old movie lines and other trivia games, and just generally hanging around, until the next break.

And with the end of southern summer coming on, we need that break soon. One last push to go.